Posts tagged Control Chart Construction


MethodologySix Sigma

X-MR Control Chart Construction Rules

Studying Six Sigma? Learn the X-MR control chart construction rules here. 1. The data must be continuous.

2. The sample size is 1 and cannot vary.

3. Collect the data in a consecutive manner. (In production order)

4. For the first chart on a process, collect at least 20–25 sample groups to ensure that an adequate measure of process variation has been taken.

5. Calculate the data points to be plotted on the chart.

Read more 0 Comments