Pre-control is a control charting methodology that uses specification limits instead of statistically-derived control limits to determine process capability over time.

Use: Pre-control charting is useful in initial process setup to get a rough idea of process capability, but this author doesn’t recommend its use because it is not statistical process control. Pre-control charting does not use continuous data found upstream in the process which is more in alignment with prevention thinking.

Six Sigma Terminology